Module 06 / Workforce Intelligence·People · Q2 FY26

Every site, every trade — productivity reasoned, fatigue predicted.

Headcount, productivity, attendance and overtime fused from HCM, site biometric attendance and project demand plan. AI surfaces understaffed projects, fatigue risk and the reallocations that close the gap.

Total Workforce
14,820+412 QoQ
9,640 direct · 5,180 contractors
Productivity Idx
94.2−3.8 pts
vs plan 98.0
Attendance
91.6%−1.4 pts
target 95%
Overtime Share
18.4%+4.2 pts
$6.8M MTD premium
Open Vacancies
284+62
62% critical trades
AI Savings ID'd
$11.6Mannualized
rebalance + OT cap
AI Workforce Briefing

Group workforce is operating at productivity index 94.2 — 3.8 points below plan — with 284 open vacancies concentrated on 4 critical trades (Steel Fixers, MEP Technicians, Electrical Commissioners, 6G Welders). Two sites (Riyadh Metro Pkg 3, Basra Power Block) account for 64% of group overtime burn and 7 of the last 10 safety incidents — a fatigue signature that AI predicts will breach acceptable risk inside 30 days unless OT is capped. Five AI actions totaling $11.6M annualized recovery are queued, with reallocation moves from DXB and Kuwait deployable inside 14 days.

Workforce by Project · 10 active
4 understaffed
ProjectReq.ActualCoverageProd.Att.OT %Status
Riyadh Metro Pkg 3
KSA · 720 contractors
1,8401,612
88%
8889.2%26.4Critical
NEOM 380kV Substation
KSA · 380 contractors
980944
96%
9191.0%22.1Strained
Duqm Refinery Phase II
Oman · 980 contractors
2,1402,104
98%
9692.8%17.4Watch
DXB T4 Expansion
UAE · 540 contractors
1,4801,502
101%
10294.8%12.6Healthy
Doha Sewage Tunnel
Qatar · 280 contractors
720712
99%
9793.2%15.2Healthy
Jeddah Airport Apron
KSA · 360 contractors
980870
89%
8988.4%24.1Strained
Basra Power Block
Iraq · 510 contractors
1,2401,108
89%
8686.4%28.6Critical
Sharjah Smart District
UAE · 320 contractors
860882
103%
9994.1%13.8Healthy
Kuwait Highway 80
Kuwait · 240 contractors
640668
104%
10194.6%14.2Healthy
Manama Coastal Defence
Bahrain · 160 contractors
380362
95%
9492.0%16.4Watch
AI Understaffing Diagnosis88% conf

Riyadh Metro Pkg 3 and Basra Power Block account for 64% of group overtime burn and the entire safety-incident concentration. Both sites are running coverage <90% on critical trades while DXB T4 and Kuwait Hwy 80 carry a combined +50 HC surplus — a textbook inter-project rebalance opportunity worth $1.1M/mo OT recovery.

Root Drivers (top 3)84% conf

1) MEP and electrical commissioner shortages on KSA mega-projects (14% structural gap). 2) Security-driven absenteeism in Iraq compounding HC short. 3) Foremen ratio degraded to 1:42 (benchmark 1:32) on two strained sites, dragging productivity ~6 pts independent of headcount.